page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64 page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
< prev - next > Energy Biogas Biogas Digest Vol 2 (Printable PDF)
Underground Water
Underground water features in all three steps of biogas implementation:
During planning, the site selection and design of the digester can eliminate most of
the problems caused by groundwater and threats to groundwater.
During construction, groundwater can be a nuisance, effecting additional costs. But it
is during construction, that serious leakage can be avoided.
During operation, little can be done but to monitor the quality of water and to avoid
surface spilling.
By positioning the biogas plant and the well, a great deal of drinking water safety can be
achieved. First, the distance should be at least 30 m, second, the biogas plant should be
downstream of surface- and groundwater flows and third, the well should be above the
biogas unit to avoid contamination through surface spilling.
During construction, ground water must be drained. An empty biogas digester can develop
such buoyancy, if surrounded by water, that the whole shell is lifted. The figure below
illustrates some simple techniques how to deal with ground water during construction of
small biogas plants.
Figure 41: Dealing with ground water during construction: The foundation rests on a stone
packing (1) to drain the water into the pump-sink (2). A layer of gravel prevents blockage of
the drain. A vertical pipe (3) allows pumping even when back-filling has be done. The lower
part of the pipe is surrounded by a stone packing (4). If the ground water is only slightly
higher than the digester bottom or if no pump is available, the construction must be
flooded. The floor must be of solid concrete (5). Water must be kept away until the outer
wall has reached above the ground water table and has been plastered from the outside.
Several bottles without bottoms are placed into the concrete (6). When scooping of water
has stopped, ground water passes through the bottle and floods the floor (7). After
completing the masonry work and covering the dome with soil, the bottle is closed and
water might be taken off the digester bottom (8). The cap of the bottle is covered with
cement mortar (9). In case of high ground water table a conical or bowl-shaped solid
concrete slab is required.
Source: Sasse, Kellner, Kimaro: Improved Biogas Units for Developing Countries, GATE 1991
63